A typical range
Many clean-water losses dry in about three to five days with proper equipment. Larger losses, thick materials and humid weather can take a week or more.
What speeds drying up
Fast extraction, enough airflow, strong dehumidification, opening wall cavities and good weather conditions all help. Hardwood and plaster take longer.
What slows it down
Stopping equipment early, closing wet cavities, running a heater improperly or leaving carpet pad in place all slow things down.
How dryness is verified
Moisture meters compare readings in wet materials with readings from unaffected areas. When they match, the material is dry.
Why you cannot go by feel
Materials can feel dry on the surface while still holding moisture inside. Readings are the only reliable way.
After drying
Once dry, equipment is removed and repairs begin. A final reading before closing the walls protects against mold.
Trust moisture readings, not the calendar, and keep the equipment running until the goal is met.